i.Supply of Drilling, work over and completion equipment  and spare parts

i.Artificial lift (ESP, PCP, BPU, ..ect)..

ii.Casing.

iii.Tubing.

iv.Wellheads.

v.Valves.

vi.Packers,…etc.).

ii.Supply of Oil and Gas Chemicals

i.Production chemicals.

ii.Drilling mud chemical.

iii.Supply of HSE Materials and equipment’s.

i.PPE.

ii.Gas detectors.

iii.Environmental surveillance devices,…etc.).

  1. Flow line and Pipeline maintenance material supply.

v.Thermal Equipment  (Thermal wellhead, thermal casing, tubing (VIT) and thermal compensator and Packers).

vi.Production and down hole tools and chemicals.

vii. Flow Line Pressure Switch

viii.Production surface equipment’s (Eco meters, monitor instruments (pressure and temperature gauge).